+90 312 815 56 07 info@isimek.com.tr

METU Heating Center

Isımek manufactured and erected Turkeys largest Steam Boiler for the heating purpose at METU Campus in 2015 . Steam Boiler with capacity 65.000 kg/hr. Heating capacity is 47 MW .Operating pressure is 18 Bar and temperatıure is 280 °C.